The increasing penetration of renewable energy resources in power system has contributed to the increasing demand for operation flexibility. To address the deficiency of flexibility in wind-photovoltaic-storage hybrid system with deepening penetration of intermittent and uncertain renewable energy resources, this paper proposes emerging flexible resources including wind, photovoltaic and energy storage providing flexible ramp capacity to improve flexibility. Considering the uncertainty of load and intermittent generation, the wind-photovoltaic-storage providing flexible ramp capacity are integrated into a two-stage stochastic dispatch model including 1h day-ahead unit commitment and 15min real-time economic dispatch. To test the efficiency of the proposed model, simulation are carried out on a modified IEEE 118-bus with 54 thermal units, the results indicate that wind-photovoltaic-storage providing flexible ramp capacity can effectively alleviate the deficiency of operation flexibility, and improve the overall economic benefit.
Read full abstract