Abstract

The pollution control of the Huangpu River in Shanghai is a large engineering project which can be benefited by system analysis. A long-term planning is complicated dynamic problem, because there are too many uncertainties, imprecisions, risks as well as intangible impacts to be considered along the time horizon. This paper presents a part of the results of system analysis which have been done jointly with Shanghai EPB and University of Michigan.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call