Abstract

The pollution control of the Huangpu River in Shanghai is a large engineering project which can be benefited by system analysis. A long-term planning is complicated dynamic problem, because there are too many uncertainties, imprecisions, risks as well as intangible impacts to be considered along the time horizon. This paper presents a part of the results of system analysis which have been done jointly with Shanghai EPB and University of Michigan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.