AbstractIn this paper the obtaining of an optimum policy in the capacity expansion planning of a particular thermal‐electric power system is proposed. Therefore, a two‐stage stochastic integer programming is formulated. The model includes, through a finite group of scenarios, the existent uncertainty related to the future availability of the thermal plants currently under operation. The resultant model is solved numerically by the application of the L‐shaped method, whose implementation and development were executed using the software AMPL, with CPLEX as a solver. The results reached are shown, which validate the use of the methodology adopted in this work.