Abstract

This contribution deals with scheduling problems of flexible chemical batch processes with a special emphasis on their real-time character. This implies not only the need for sufficiently short response times, but in particular the burden of in-complete knowledge about the future. To solve such problems, the application of two-stage stochastic integer programming techniques on moving horizons is proposed. They reflect the need for immediately applicable decisions and the potential of later recourse actions to cope with realized uncertainties. In addition to the classical expected value objective, simple measures of risk can be included. Motivated by an example process, some essential modeling prerequisites are discussed. As an important first step, the master scheduling problem is studied and a number of master scheduling models are presented. Large mixed-integer linear problems arise, which are well-suited for a dual decomposition approach. Numerical experiments with a problem-specific solution algorithm demonstrate the applicability of the method to real-world problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.