The conventional quality control method of core rockfill dam construction exhibit difficulty controlling compaction parameters accurately or ensuring construction quality. This is because it is easily influenced by human behavior or lack of adequate management. We therefore establish the timely monitoring indexes and control criteria of compaction processes by considering the characteristics and quality requirements of high core rockfill dam construction. Based on the established indexes and criteria, integrating GPS, GPRS and PDA technologies, a real-time compaction quality monitoring method is proposed. The relevant key techniques are proposed as well, including automatic collection of information and a graphic algorithm for rolling-process visualization. By the proposed method and techniques, a real-time monitoring system is provided to realize the precise automatic online entire-process monitoring of compaction parameters, including compaction pass, rolling trajectory, running speed of roller, vibration status and rolled pavement thickness. The application of the Nuozhadu project shows that the proposed system can control compaction parameters effectively and ensure better construction quality. Therefore, it might become a new way towards construction quality control of high core rockfill dam.