Abstract
The design of a 250-foot high sloping core rockfill dam, part of a hydroelectric project, was determined to facilitate construction with materials readily available at the site. The paper describes the site and discusses construction procedures and performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have