Abstract

Construction progress and quality are two important objectives in the construction of high core rockfill dam. It is of great significance to evaluate their control effect comprehensively. In this paper, the progress and quality of high core rockfill dam construction management are the study objectives. in order to achieve the real-time control of coupling them, the comprehensive evaluation method for the quantitative analysis of their complex relationship is proposed. Based on the comprehensive analysis of the mechanisms of the influence related factors in the construction process, the comprehensive evaluation index system of the high core rockfill dam coupling construction progress and quality is designed ; the comprehensive evaluation index data acquisition process is analyzed; the comprehensive evaluation method for the high core rockfill dam filling unit is put forward. finally, a comprehensive evaluation of high core rockfill dam filling unit model based on TOPSIS is established. Engineering examples show that this method plays a guiding role in real-time control of coupling high core rockfill dam construction progress and quality.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.