The production of rare radioactive ion beam (RIB) far from the valley of stability is one of the final purposes of the Spiral2 facility in Caen. The RIB will be produced by impinging a deuteron beam onto a carbon sample to produce a high neutron flux, which will interact with a uranium target. The primary deuteron beam is produced by an ion source based on ECR plasma generation. The deuteron source and the low energy beam transport (LEBT) has been assembled and tested at CEA Saclay. Diagnostics from other laboratories were implemented on the LEBT in order to characterize the deuteron beam produced and compare it to the initial simulations. The ion source has been based on a SILHI-type source, which has demonstrated good performances in pulsed and continuous mode, and also a very good reliability on long term operation. The 5 mA of deuteron beam required at the RFQ entrance is extracted from the plasma source at the energy of 40 kV. After a brief description of the experimental set-up, this article reports on the first beam characterization experiments.