In order to control the deformation of the surrounding rock of the large section of the tunnel, the author analyzes the stratum displacement law caused by the tunnel excavation by means of on-site monitoring. And the optimized design of the existing tunnel pre-reinforcement scheme is carried out. The FLAC3D numerical simulation method is used to verify the feasibility of the pre-reinforcement optimization scheme. Field test showed that the tunnel surrounding rock deformation in the allowable range, and the deformation control measures of the surrounding rock are reasonable and effective. The research results have important guiding significance for future similar project.
Read full abstract