Abstract
The article discusses the use of a network planning simulation model using the critical path method to optimize the planning process. The main goal of the study is to develop and apply an innovative approach to project management, which will optimize resources, reduce task completion time and increase planning efficiency. The paper presents the main stages of developing a simulation model, and also conducted experiments to evaluate the effectiveness of the proposed approach. The results obtained confirm the possibility of using simulation models and the critical path method in network planning to achieve optimal results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.