Abstract

In order to learn network planning, need an understanding of some of the provisions. A project is the overall effort in the form of networks planning. The project consists of a series of events and activity that construct a system and cycles that boils down to an outcome. To create an operational plan, project hardware included/required a tool that will give an idea clearly relationship, such as device is network planning. On the operational level, the project network planning method is the Critical Path Method (CPM). To understand the readings and analysis CPM is necessary basics Arrow Diagramming Method. In this method will be elaborated and relationship between activities with other activities, one event relationship with other event system and thus forming the structure of work processes. In other words, in the planning of the CPM, in the first of finishing is elaborated arrow diagram. Thats mean the network planning has finish a half procces, so the next step will be easily to finish all diagram. Network planning CPM that initially looks like very complicated and abstract, but with an understanding of the arrow diagram will be known quickly, which where activities having relationship that are free and which ones are interdependent, and which part is the critical. Keywords : Network planning, Critical path method

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.