Abstract
In practice of increased responsibility structures design there are often weak saturated clayey soils with low characteristics of deformability and strength take place on the construction site. In these cases, foundations using piles-drains of sandy or coarse material are recommended by norms, which is able to bear the load and to accelerate the consolidation process. The presented solutions include an analytical solution of the interaction problem between piles and slab raft foundation with the surrounding soil of the base with the possibility of extension of pile shaft. The closed-form solutions to determine the stresses in pile shaft and in the soil under the foundation slab are obtained. The article presents the results of large scale tests in the pilot area construction of major energy facilities in Russia.