Abstract

Conflicts in construction projects seem an increasingly prevalent phenomenon in Kenya, perhaps because of the projects’ uncertainty, complexity, and diversity of participants. Management of these conflicts remains ineffective, an occurrence that creates a major obstacle to the success of project implementation, usually leading to an increase in project cost, delayed project completion, and in worst cases suspension of the project. A review of literature has revealed the negative role played by conflict on project success.This study sought to investigate the practice of conflict management in construction projects in Kenya to develop a schematic framework for managing conflicts, using project harmony potential as a measure of the availability of conflicts or their lack in construction projects. The study adopted a cross-sectional research design. Construction projects registered with NCA in the last five years within Nairobi and having the embedded unit of analysis of project participants under this study were sampled using the cluster method. Questionnaires were administered to project developers, contractors, and consultants working in consultancy or contractor firms randomly sampled. The study used inferential analysis of bivariate Pearson’s correlation and Regression analysis to determine the significant factors affecting the project harmony potential as well as establish a predictive model. The study demonstrated that there was a positive and statistically significant linear relationship between project harmony potential and delay management, project team partnering orientation, direct provisions for conflict management in the Project Handbook, promptness of Monitoring and Evaluation work, CPM (Construction Project Manager) technical experience, and communication plan. These factors were considered to be critical factors for the project harmony potential for construction projects in Kenya. A model was established using these variables and was found to explain 69.1% of the project harmony potential. The developed model will be useful in predicting the harmony potential of a project during implementation.

Highlights

  • Construction projects are unique and cover a wide range of products and expertise conducted in an environment that is Manuscript received on March 09, 2021

  • Whereas most building sites have foremen in charge of diverse trades or a general foreman in accountable of all other foremen, a low recurrence was due to the longing to generally lock in mostly academically competent persons to respond to the questionnaire

  • Promptness of Monitoring and Evaluation work, Research findings concluded that the project harmony CPM technical experience, and Clear communication plan potential was average

Read more

Summary

Introduction

Construction projects are unique and cover a wide range of products and expertise conducted in an environment that is Manuscript received on March 09, 2021. Revised Manuscript received on March 15, 2021 Manuscript published on March 30, 2021 * Correspondence Author. Mr Samuel Kiilu Mbatha*, Student, Masters in Construction Project Management, Jomo Kenyatta University of Agriculture and Technology (JKUAT), Juja, Kenya. Dr Ahmad Omar Alkizim, Department of Construction Management, School of Architecture and Building Sciences (SABS, Jomo Kenyatta University of Agriculture and Technology (JKUAT), Juja, Kenya. Dr Titus Kivaa Mbiti, Department of Construction Management, School of Architecture and Building Sciences (SABS, Jomo Kenyatta University of Agriculture and Technology (JKUAT), Juja, Kenya.

Objectives
Methods
Results
Conclusion