Abstract

In order to solve the problem of low accommodation rate of renewable energy in a single region, considering the output characteristics of wind power and photovoltaic, grid constraints and cross regional power exchange, an optimization model of renewable energy accommodation capacity in a cross regional power grid year is established. This paper analyzes the factors restricting the accommodation capacity of renewable energy, and determines the access scale of renewable energy units according to the characteristics of different power grid scale, load and power supply structure. And then taking the annual maximum accommodation capacity of renewable energy as the goal, the time series production simulation model is established, considering the constraints such as regional load balancing, power transmission and output of the network cable, unit output, unit optimization power ramp rate and renewable energy output. To improve the renewable energy accommodation capacity, the three factors of power system interconnection level, power regulation performance and load characteristics can be considered.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call