Abstract

i Yoshimura , one of the authors, have developed a new method for correcting railway track irregularity using heavy tamping machines. This method is more effective and efficient than conventional correcting methods. It requires somewhat complicated calculation, however. So in order to put this method into practice in the filed, we have developed an interactive calculation software. In the present paper, we describe the theory of calculating an optimum controlling data for a heavy tamping machine and features of the software.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.