Abstract

The aim of this research is to comprehend in details how revitalization and development of railway infrastructure on the Trans-Sumatera line in Sumatera Island. The main problem in this research is that the use of railways in Sumatera Island is neither sustainable nor in all provinces. This research is both meta-analytical, by exploring the existing journals, and factual as a phenomenon in the utilization of spoor width that happens in the world today. It is completed by parameter or performance indicators as for benchmarking with other countries. From the result of this research, the data shows that almost 60 percent of existing railway tracks around the world have been installed with standard gauge of 1,435 mm and have been international standard. The benefit of this study is that the leaders or decision makers can take it into account to support the future transportation in Sumatera Island which must be oriented to bigger, faster, safer, cleaner, cheaper, affordable, and leisure. To keep exploiting the existing railway or track can be done by developing construction equipment of track gauge adjuster to change the wheel gauge from 1,435 mm to 1,067 mm. Subsequently re-gauging is done in stages, changing the track gauge from narrow gauge of 1,067 mm to standard gauge of 1,435 mm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.