Abstract

In this paper the analysis of the EOQ repair and waste disposal model with variable setup numbers for production and repair within some collection time interval is continued. The cost analysis is now extended to the extreme waste disposal rates and it is shown that the pure (bang-bang) policy of either no waste disposal (total repair) or no repair (total waste disposal) dominates the strategy of mixing waste disposal and repair. Moreover, the different behavior of the minimum cost, of the optimal setup numbers, lot sizes and collection intervals for small and large waste disposal rates is discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.