Abstract

In this paper EOQ repair and waste disposal model with variable setup number n and m for production and repair, respectively, within some collection time interval is considered as an integer nonlinear program. The cost analysis is extended to the extreme waste disposal rates and it is shown that the pure strategy for either total repair or total waste disposal is dominant. Furthermore, the minimal cost function and the optimal solution for that integer program is characterised and optimal and approximate solutions are presented for several subclasses of the problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.