Abstract

The Cambio Lofts Apartment Construction Project in South Tangerang is a project owned by PT Graha Indah Semesta which was carried out by PT. Brantas Abipraya (Persero) with a contract value of IDR 640,000,000 for 1369 calendar days. project planning Properis needed to realize the project on time, cost, and quality. For this reason, it is necessary to prepare a project planning that includes organizational structure, site layout, strategy and implementation methods, quality and K3 plans, scheduling, and costs. The data needed in the preparation of Project Planning are project drawings, work plans and requirements, and basic unit prices. In preparing the work schedule using the program Microsoft Project 2019 and project costs using the program. Microsoft Excel 2019 The results of the preparation are, using a functional organizational structure, the strategy is to use two tower cranes and divide work zones, the quality of work is carried out by testing materials in the field to match technical specifications and SOP (Standard Operation Procedure) and for the prevention of work accidents, workers must use Personal Protective Equipment (PPE), and install work signs. The duration of the project is 950 calendar days with a budget of Rp. 574,259,927,661.21.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call