Abstract

The Indonesian International Islamic University Depok Library Building Construction Project has area of 16495 m2. This library has 8 floors, which is located in the middle of the city. So, the mobilization of tools and materials become easier. The purpose of this study is to make project planning in terms of organizational structure, site layout, traffic management, strategy and implementation methods, quality, safety, occupational health and environment (K3L); Project Implementation Budget Plan and project scheduling. The data used are shop drawings, Work Plan and Conditions, and HSD Depok City 2020. Planning a project schedule using the Barchart method with the help of MS. Project 2016. This planning produces a line type organizational structure where the leaders and subordinates are in one line of command; Site Layout by using 1 unit tower crane; Traffic Management planning using a one gate system; The implementation strategy uses 2 zones; The implementation method uses Bottom Up, starting from zone 1 then proceed to zone 2 until the 8th floor; Quality plan based on the application of SOP (Standard Operating Procedure); The HSE plan includes hazard identification, an HSE equipment plan, and an HSE implementation schedule; The project duration plan is 43 weeks, and the Implementation Budget Plan is Rp. 151,141,347,875.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call