Abstract

The high attractiveness of the Black Sea coast in the Russian Federation, the ongoing work to create a world-class resort infrastructure lead to the need for the high-rise buildings’ construction and other heavy structures on steep grades that characterize most of the coastal strip. In such cases, they try to find the solutions that do not lead to a significant amount of earthwork when deepening the required number of floors under the stain of a high-rise building. However, with a large steepness of the relief, the excavation volume is always significant. Excavation during the engineering preparation of the territory and the development of deep pits leads to a loss of the slopes’ stability and, consequently, to the complex foundations’ solutions, engineering protection and overhead structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.