Abstract
With the development of renewable energy and the rapid growth of thermal load, due to the influence of the mode of “determining power by heat”, the power grid dispatching in heating season can not accurately adjust the unit load, and the peak load regulation capacity of power grid is limited. Through the load capacity test of cogeneration units in heating season, the adjustment range and limiting factors of different types of units are obtained, which can be used as reference for power generation enterprises and power grid dispatching operation.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have