Abstract

With the development of renewable energy and the rapid growth of thermal load, due to the influence of the mode of "determining power by heat", the power grid dispatching in heating season can not accurately adjust the unit load, and the peak load regulation capacity of power grid is limited. Through the load capacity test of cogeneration units in heating season, the adjustment range and limiting factors of different types of units are obtained, which can be used as reference for power generation enterprises and power grid dispatching operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.