Abstract
This work examines the complexity of scheduling for high level synthesis. It has been shown that the problem of finding the minimum time schedule for a set of chains of operations of two types using two processors, one of each type, is NP‐complete. However, for two chains only, a polynomial time algorithm can been obtained for scheduling with two processors. The problem of scheduling a rooted binary tree of two operation types on two processors, one of each type, has been shown to be NP‐complete. It has also been proved that absolute approximations for schedule length minimization or processor minimization are NP‐complete. A related resource constrained scheduling problem has also been shown to be NP‐hard.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.