Abstract

Production planning and scheduling models arising in automated manufacturing environments exhibit several features not encountered in models developed for traditional production systems. For instance, models of automated facilities typically include tooling constraints which reflect the possibility for a machine to use different tools in order to perform successive operations, within limits imposed by the size of the tool magazine. Also, these models often account for the existence of flexible material handling systems whose activities must be synchronized with the machining operations in order to optimize system utilization. In this paper, we describe a few interesting combinatorial optimization problems proposed in this framework, we point to their relationships with models investigated in seemingly remote areas, and we identify a number of challenging open problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.