Abstract

AboutSectionsView PDF ToolsAdd to favoritesDownload CitationsTrack CitationsPermissionsReprints ShareShare onFacebookTwitterLinked InEmail Go to Section HomeInterfacesVol. 34, No. 2 Implementing a Production Schedule at LKAB's Kiruna MineMark Kuchta, Alexandra Newman, Erkan TopalMark Kuchta, Alexandra Newman, Erkan TopalPublished Online:1 Apr 2004https://doi.org/10.1287/inte.1030.0059AbstractLKAB's Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly using an underground mining method known as sublevel caving. To efficiently run the mills that process the iron ore, the mine must deliver planned quantities of three ore types. We used mixed-integer programming to schedule Kiruna's operations, specifically, which production blocks to mine and when to mine them to minimize deviations from monthly planned production quantities while adhering to operational restrictions. These production schedules save costs compared to schedules produced manually by meeting desired production quantities more closely and reducing employee time spent on preparing schedules. Previous Back to Top Next FiguresReferencesRelatedInformationCited byA Multi-Equipment Task Assignment Model for the Horizontal Stripe Pre-Cut Mining Method7 December 2022 | Sustainability, Vol. 14, No. 24Integrated stochastic optimization of stope design and long-term underground mine production schedulingResources Policy, Vol. 78Underground production scheduling with ventilation and refrigeration considerations13 January 2022 | Optimization and Engineering, Vol. 23, No. 3Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedulesResources Policy, Vol. 77A review of machine learning applications for underground mine planning and schedulingResources Policy, Vol. 77Underground mine scheduling under uncertaintyEuropean Journal of Operational Research, Vol. 294, No. 1Mathematical Programming Application in Sublevel Caving Production Scheduling9 August 2021 | Mining, Vol. 1, No. 2Barrick’s Turquoise Ridge Gold Mine Optimizes Underground Production Scheduling OperationsAndrea Brickey, Akshay Chowdu, Alexandra Newman, Marcos Goycoolea,Raphael Godard24 July 2020 | INFORMS Journal on Applied Analytics, Vol. 51, No. 2A heuristic approach for scheduling activities with ‘OR’-precedence constraints at an underground mine16 March 2020 | International Journal of Mining, Reclamation and Environment, Vol. 34, No. 10Optimizing underground mine design with method-dependent precedences20 November 2020 | IISE Transactions, Vol. 5Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directionsResources Policy, Vol. 68Strategic planning of an underground mine with variable cut-off grades23 December 2019 | Optimization and Engineering, Vol. 21, No. 3Model of room and pillar production planning in small scale underground mines with metal price and operating cost uncertaintyResources Policy, Vol. 65The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)Resources Policy, Vol. 63Long-Term Room and Pillar Mine Production Planning Based on Fuzzy 0-1 Linear Programing and Multicriteria Clustering Algorithm with UncertaintyMathematical Problems in Engineering, Vol. 2019Production Scheduling in Sublevel Caving Method with the Objective of NPV Maximization22 February 2019KAZI ARINI SINIRI OPTİMİZASYONU İÇİN GELİŞTİRİLEN YÖNTEMLER VE ÖRNEK BİR UYGULAMA1 December 2018 | Bilimsel Madencilik DergisiOptimizing the Cutoff Grade for an Operational Underground MineBarry King, Alexandra Newman1 August 2018 | Interfaces, Vol. 48, No. 4An operational-level multi-stage mine production timetabling model for optimally synchronising drilling, blasting and excavating operations23 March 2016 | International Journal of Mining, Reclamation and Environment, Vol. 31, No. 7Large-scale mine production scheduling optimisation with mill blending constraints at Newmont’s Twin Creeks Operation29 July 2016 | Mining Technology, Vol. 125, No. 4An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation23 June 2014 | Mining Technology, Vol. 123, No. 3Medium-Term Production Scheduling of the Lumwana Mining ComplexMartin L. Smith, Stewart J. Wicks1 April 2014 | Interfaces, Vol. 44, No. 2Optimisation of a mixed truck fleet schedule through a mathematical model considering a new truck-purchase option10 April 2014 | Mining Technology, Vol. 123, No. 1A multi-step approach for block-cave production scheduling optimizationInternational Journal of Mining Science and Technology, Vol. 23, No. 5Mining truck scheduling with stochastic maintenance cost17 August 2012 | Journal of Coal Science and Engineering (China), Vol. 18, No. 3Optimizing Long-Term Production Plans in Underground and Open-Pit Copper MinesRafael Epstein, Marcel Goic, Andrés Weintraub, Jaime Catalán, Pablo Santibáñez, Rodolfo Urrutia, Raúl Cancino, Sergio Gaete, Augusto Aguayo, Felipe Caro, 1 February 2012 | Operations Research, Vol. 60, No. 1Operations research in the natural resource industry10 January 2011 | International Transactions in Operational Research, Vol. 19, No. 1-2A Short-Range Scheduling Model for Blockbuster's Order-Processing OperationCasey Chung, Milind Dawande, Divakar Rajamani, Chelliah Sriskandarajah, 1 October 2011 | Interfaces, Vol. 41, No. 5A heuristic approach to long-range production planning of cement quarry operations20 September 2010 | Production Planning & Control, Vol. 22, No. 4A solution approach for optimizing long- and short-term production scheduling at LKAB’s Kiruna mineEuropean Journal of Operational Research, Vol. 211, No. 1A new MIP model for mine equipment scheduling by minimizing maintenance costEuropean Journal of Operational Research, Vol. 207, No. 2Implementing a blending optimization model for short-range production planning of cement quarry operation26 January 2011 | Journal of Mining Science, Vol. 46, No. 5A Review of Operations Research in Mine PlanningAlexandra M. Newman, Enrique Rubio, Rodrigo Caro, Andrés Weintraub, Kelly Eurek, 7 April 2010 | Interfaces, Vol. 40, No. 3A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS20 November 2011 | Asia-Pacific Journal of Operational Research, Vol. 27, No. 03Front Range Aggregates Optimizes Feeder Movements at Its QuarryPeter McKenzie, Alexandra M. Newman, Luis Tenorio, 1 December 2008 | Interfaces, Vol. 38, No. 6Using aggregation to optimize long-term production planning at an underground mineEuropean Journal of Operational Research, Vol. 176, No. 2A Review of Long- and Short-Term Production Scheduling at Lkab’s Kiruna MineLong- and Short-Term Production Scheduling at Lkab's Kiruna MineAn Integrated Approach to the Long-Term Planning Process in the Copper Mining Industry Volume 34, Issue 2March-April 2004Pages 87-169 Article Information Metrics Information Published Online:April 01, 2004 © 2004 INFORMSCite asMark Kuchta, Alexandra Newman, Erkan Topal, (2004) Implementing a Production Schedule at LKAB's Kiruna Mine. Interfaces 34(2):124-134. https://doi.org/10.1287/inte.1030.0059 Keywordsproduction and scheduling: applicationsPDF download

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call