Abstract

The production planning and scheduling model of remanufacturing system is a new type of production planning and scheduling system. The construction of production planning and scheduling model is based on AHP algorithm. The basic idea of this model is to use the same production plan in the manufacturing process and remanufacturing process of the original product. This method can be used in any industry or company with two different products: the original product and its remanufactured version. In addition, it allows you to calculate the cost difference between the two versions. It also provides information on the time required to produce each project (if there are multiple projects).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call