Abstract
The production planning and scheduling model of remanufacturing system is a new type of production planning and scheduling system. The construction of production planning and scheduling model is based on AHP algorithm. The basic idea of this model is to use the same production plan in the manufacturing process and remanufacturing process of the original product. This method can be used in any industry or company with two different products: the original product and its remanufactured version. In addition, it allows you to calculate the cost difference between the two versions. It also provides information on the time required to produce each project (if there are multiple projects).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.