Abstract

The power plant of Simeri Crichi (Calabria Region, Italy) under study was already managed by Edison S.p.A. and it is fueled by natural gas. This study is dealing with the hypothesis to perform a retrofit device of the plant, with the addition of a standard “CO2 Capture”, able to perform a capture rate up to 90%; it has been proposed here the sizing of the compression station and the pipeline which connects the plant to the injection site Botricello 1, studied in the frame of a gross screening of the storage sites in the Calabria Region in Italy. This study took into account the costs of construction, operation and maintenance (O&M) of both the compression plant and the sound pipeline. Eventually, an estimation of the gross static storage capacity of the Botricello1 reservoir is provided.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.