Abstract

In recent years, with the rapid development of high-speed railways, the problem of differential settlement of road-bridge transition sections has become increasingly prominent. The uneven settlement of the road-bridge transition has a great impact on the driving safety and comfort of high-speed vehicles, especially for high-speed railway projects under special ground conditions such as soft stop. And with the continuous increase in train speed and axle weight, the differential settlement requirements at the over-bands are becoming more stringent. The problem of “jump at the bridgehead” has become one of the important factors affecting the safety of highspeed trains. In view of the current situation, theoretical analysis and numerical calculation are used as research methods in this paper. The factors of uneven settlement and deformation of the road-bridge transition section are systematically analyzed and corresponding methods for foundation treatment are proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.