Abstract
This research presents study of inspection for electrical safety in electrical system. The four locations are observed. The objective of this research are to study the problems which may be occurred in electrical system and introduce the prevent ways. The four locations consist of 2 factories of paper and 2 animal food factories. For factory of paper, the total electrical load is 18,450 kVA which consists of 10 transformers and another 13,450 kVA which consists of 10 transformers. For the animal food 800 kVA, another is 1000 kVA which each location is a transformer. The inspected systems include transformer, main distribution board, ground and electrical wire systems. The check instruments are test oil maker, thermo scan, earth clamp tester, earth ground tester, infrared tester and outlet tester. The all data from test is analysed to compare among of four locations. For experimental results, it is of found that for transformer, the oil insulation transformer is lower than standard and silica gel is deteriorated and broken box, rubber shield and rubber gasket is broken and damage. For main distribution board, the ground value is lower than standard and the temperature of junction for breaker is high and more dust. For ground system, the ground value is lower than standard and broken. For wire system, the electrical is damaged because of heat and animal.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.