Based on the single-phase H-H power unit topology in the novel co-phase power supply system, with the back-to-back grid-connected operation method, this paper aimed at solving the problem that in experiment, system capacity constraints caused the failure to achieve unit full power output and proposed the strategy of rectifier voltage, current double closed loop and full disturbance feed-forward control. Finally, based on the digital signal processor (DSP) and complex programmable logic device (CPLD), this study constructed a hardware platform of the power unit control system. Experimental results show that the system is stable, achieving two-way flow of energy.
Read full abstract