Abstract

Based on the single-phase H-H power unit topology in the novel co-phase power supply system, with the back-to-back grid-connected operation method, this paper aimed at solving the problem that in experiment, system capacity constraints caused the failure to achieve unit full power output and proposed the strategy of rectifier voltage, current double closed loop and full disturbance feed-forward control. Finally, based on the digital signal processor (DSP) and complex programmable logic device (CPLD), this study constructed a hardware platform of the power unit control system. Experimental results show that the system is stable, achieving two-way flow of energy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.