Electric supply system in enterprises must provide with electrical supply continuity and reliability as in normal and accidental regimes, quality electro energetic, production efficiency, so in connection with these in the article there have been analyzed work regimes of substations, studied electrical net scheme for Kentau Transformer Plant’s substation, calculated plant’s loads and short circuit currents and on the base of the calculated results curried out inspection for the chosen equipment. The number of connections, reliability of power supply and prospects for development are the determining factors for choosing the electrical scheme of high-voltage switchgears. You also need to take into account the need to conduct audits and tests of switches without interruption. In our case, we have four connections: two communication lines with electrical systems and two transformers. The distribution devices of the substation of the Kentau transformer plant are connected to the transformers according to a block scheme. Electrical installations are connected to the network transformer unit or receive backup power from another substation, since in case of failure of one network, both transformers can not work with the rest of the network. Based on this, measures are proposed for the reconstruction of the substation, with the replacement of the block diagram of the switchgear with the circuit for connecting the power transformer to the switchgear by a bus bridge. Offered measurements on reconstruction of the substation by replacing block scheme of switchgears to scheme of power transformer connection with DD bus bridge. Worked out main modernization problems of the substation switchgear, done calculation and selection of distributing bus bars for arranging switchgear.
Read full abstract