Steel truss bridges are especially vulnerable in the event of a sudden loss of a load-carrying element, which can trigger a chain of failures. This paper describes a unique case study of a steel truss bridge under construction subjected to sudden member breakages with an extensive monitoring system. The failures occurred during the dismantlement of temporary members that had been used to transform a three-span simply supported steel truss bridge into a three-span continuous structure during incremental launching. These temporary members needed to be removed once the bridge reached its final position. The robustness of the bridge was assessed using computer simulations of various failure scenarios to evaluate its capacity to effectively activate alternative load paths (ALPs). The results demonstrated the structural redundancy of the steel truss bridge. However, the dynamic response resulting from the failure of the temporary upper chord, due to the initially high tension in the rods, should not be overlooked. To mitigate this issue, a structural retrofitting method was proposed, involving jacking the truss girder above the side pier to reduce the tension in the temporary upper chord above the middle pier. The effectiveness of this method was demonstrated through both simulated and formal experimental tests.
Read full abstract