In order to accurately obtain the characteristic parameters of the rock mass structural plane of the tunnel and provide effective basis for numerical calculation, based on tunnel of Guiguang railway, this paper measured the structural characteristics of typical tunnel side wall and excavating face by using Sirovision non-contact measurement technology of 3d photogrammetry and accomplished digital geological logging, information statistics of structural plane attitude, rock stability analysis. By using the discrete element software UDEC, the whole process of tunnel excavation, primary support and secondary lining are simulated. The study show that the surrounding rock deformation, internal force of primary support, axial force of anchor bolt will improve with the increase of fragmentation degrees of surrounding rock. The primary support is the determinant of constraint of surrounding rock deformation and bearing the load after tunnel excavation. Secondary support only as a permanent support structure, as a safety margin, the internal force is small compared with the primary support, but taking into account the decreasing of physical and mechanical parameters of the surrounding rock excavation, rheology of soil and reducing of mechanical properties of primary support material. The secondary lining should be calculated and designed as force structure.
Read full abstract