The development of fields that are at a late or final stage of operation is carried out mainly with the use of downhole sucker rod pumps. The most characteristic failures for these installations are rods parting-twist off and malfunctions of pump valves. The methods of eliminating these accidents vary significantly the parting or twist off of the rods involves lifting of the downhole equipment, and the "sticking" of the shut-off valve assembly of the pump is eliminated by "resuscitation" of the downhole equipment (flushing with water, hot oil or solvent). An error in fault identification leads to incorrect planning of work to restore the operability of the downhole equipment and, as a result, to economic losses.
 The cause of malfunctions of the downhole equipment of downhole rod pumping units, as a rule, is determined by analyzing dynamograms. However, in many cases dynamograms do not allow to distinguish the lower twist off of the rods from the malfunction of the valves of the rod pump. In the presented work, a method for the operational determination of the parting or twist off of rods in the well is considered, which consists in creating an electrical circuit "rod string tubing string" and monitoring its integrity. To determine the type of malfunction, the synchronization unit measures the resistance of the system on the dielectric insert via the electromagnetic channel. In case of parting or twist off of the rods, the electrical resistance of the "tubing-pump-rod string" circuit will be much higher (more than 2 ohms) than in the absence of this failure (0...2 ohms).
Read full abstract