Manufacturing processes are often disrupted by unexpected events, such as machine breakdowns, raw material shortages, and the arrival of new orders. Effectively managing these uncertainties is crucial for maintaining the feasibility and optimality of the production system. The efficiency of a manufacturing system is heavily dependent on the optimality of its scheduling plan. In this study, we present a reactive scheduling approach based on the S-graph framework. The proposed method is specifically designed to handle the arrival of new jobs and generate schedules with the shortest makespan, i.e., the minimum total completion time. Whenever a new order is received, the method dynamically adjusts the production plan through rescheduling. Three distinct scheduling policies are identified that determine which tasks require scheduling or rescheduling and which tasks should remain unchanged in their schedules. To evaluate the effectiveness of the algorithm, we solve several examples from the literature and analyze the results. The findings demonstrate the efficiency and efficacy of the proposed approach. The ability to accommodate new job arrivals and generate schedules with a minimized makespan highlights the practical relevance and benefits of the S-graph-based reactive scheduling method.
Read full abstract