In this paper, the problem of minimizing maximum cost and makespan simultaneously on an unbounded parallel-batching machine is considered. An unbounded parallel-batching machine is a machine that can handle any number of jobs in a batch and the processing time of a batch is the largest processing time of jobs in the batch. The main goal of a multicriteria problem is to find Pareto optimal solutions. We present a polynomial-time algorithm to produce all Pareto optimal solutions of this bicriteria scheduling problem.
Read full abstract