Abstract

In this paper we consider the problem of scheduling parallel batching machines with jobs of arbitrary sizes. The machines have identical capacity of size and processing velocity. The jobs are processed in batches given that the total size of jobs in a batch cannot exceed the machine capacity. Once a batch starts processing, no interruption is allowed until all the jobs are completed. First we present a mixed integer programming model of the problem. We show the computational complexity of the problem and optimality properties. Then we propose a novel ant colony optimization method where the Metropolis Criterion is used to select the paths of ants to overcome the immature convergence. Finally, we generate different scales of instances to test the performance. The computational results show the effectiveness of the algorithm, especially for large-scale instances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.