As part of the implementation of the severe accident policy, nuclear power plants in the US are conducting the individual plant examination of external events (IPEEE). Seismic events are treated in these IPEEEs by either a seismic probabilistic risk assessment (PRA) or a seismic margin assessment. The major elements of a seismic PRA are the seismic hazard analysis, seismic fragility evaluation of structures and equipment and systems analysis using event tree and fault tree analysis techniques to develop accident sequences and calculate their frequencies of occurrence. The seismic margin assessment is a deterministic evaluation of the seismic margin of the plant beyond the design basis earthquake. A review level earthquake is selected and some of the components that are on the success paths are screened out as exceeding the review level earthquake; the remaining ones are evaluated for their seismic capacity using information from the original plant design criteria, test data and plant walkdown. The IPEEEs of over 100 operating nuclear power plants are nearing completion. This paper summarizes the lessons learned in conducting the IPEEEs and their applicability to nuclear power plants outside of the United States.