PurposeThe meshfree node-based smoothed point interpolation method (NS-PIM) is extended to the forward and inversion analysis of a high gravelly soil core rock-fill dam during construction periods.Design/methodology/approachAs one member of the meshfree methods, the NS-PIM has the advantages of “softer” stiffness and adaptability to large deformations which is quite indispensable for the stability analysis of rock-fill dams. In this work, the present method contains a reconstruction procedure to deal with the existence or nonexistence of the construction layers. After verifying the validity of the NS-PIM method for nonlinear elastic model during construction period, the convergence features of the NS-PIM and FEM methods are further investigated with different mesh schemes. Furthermore, the NS-PIM and FEM methods are applied for the forward analysis of a high gravelly soil core rock-fill dam and the convergence features under complex stress conditions are also studied using the rock-fill dam model. Finally, the NS-PIM method is used to calculate the Duncan–Chang parameters of the deep overburden under the high gravelly soil core rock-fill dam based on the back-propagation neural network method.FindingsThe results show that: the NS-PIM solution for construction analysis still possesses the property of upper bound solution even under complex stress conditions and can provide comparatively more conservative results for safety evaluation. Furthermore, it can be used to evaluate the accuracy of results and mesh quality together with the FEM solution which has the property of lower bound solution; the inversion analysis in this work provides a set of material parameters for the deep overburden under high rock-fill dam during construction period and the calculated results show good agreement with the measured displacement values and it is feasible to apply the NS-PIM to the forward and inversion analysis of high rock-fill dams on deep overburden during construction periods.Research limitations/implicationsIn further study, the feasibility of three-dimensional problems, elastic–plastic problems, contact problems and multipoint inversion can still be probed in the NS-PIM solution for the forward and inversion analysis of high rock-fill dams on deep overburden.Practical implicationsThis paper introduced a method for the forward and inversion analysis of high rock-fill dams during construction period using the NS-PIM solution. The property of upper bound solution ensures that the NS-PIM can provide more conservative results for safety evaluation. The inversion analysis in this work provides a set of material parameters for the deep overburden under high rock-fill dam during construction periods.Originality/valueFirst, the analysis from forward to inversion for high rock-fill dams during construction period using the NS-PIM solution is accomplished in this work. A procedure dealing with the existence or nonexistence of the construction layers is also developed for the construction analysis. Second, it is confirmed in this work that the NS-PIM still possesses the property of upper bound solution even under complex stress conditions (the forward analysis of high rock-fill dams during construction period). Thus, more conservative results can be provided for safety evaluation. Furthermore, it can be used to evaluate the accuracy of results and mesh quality together with the FEM solution which has the property of lower bound solution. Third, the calculated material parameters of the deep overburden in this work can be used for further studies of the high rock-fill dam.
Read full abstract