Flexible manufacturing shop is examined. Multilevel control system of the shop is built. The demands to the system construction are listed. The existing input information is insufficient for building of the inventory model, for choice and realization of the optimal model of the manufacture. By this reason the situation of the uncertainties is arise. For the purpose to find needed data and to receive necessary knowledge the following intelligence procedures are suggested: ”Pendulum” – for stock foundation and for construction of the inventory model, “Symmetry in the arithmetical progression” – to define the values of the coefficients with unknown quantities in the aim function of the optimal task. With the help of the procedure “Pendulum” the equal corteges of the quantum of time are building. Cortege of the quantum of time is the unit of the stock and the direction for selection of the kind of the optimization model. The optimization model of location is suggested to use. Building of the indicated models (they are small dimension and equal dimension) give the opportunity to organize the parallel calculations.
Read full abstract