In the western of china, the deep mining area with super-thick and weak cementation overburden is vast, sparsely populated and the ecological environment is extremely fragile. With the large-scale exploitation of deep coal resources, it is inevitable to face green mining problem, whose essence is the surface subsidence control. Therefore, it is necessary to study the control technology for the regional mining based on the evolution law of subsidence movement and energy-polling of super-thick and weak cementation overburden, and put forward the economically design scheme that can control strata movement and surface subsidence in a certain degree. Based on the key strata control theory, this paper puts forward the subsidence control scheme of partial filling -partial caving in multi-working face coordinated mining, and further studies its control mechanism through the numerical simulation and then analyzes the control effect of the strata movement and energy-polling in the fully caving mining, backfill mining, wide strip skip-mining and mixed filling mining method etc., the following conclusions are detailed as follows: (1) The maximum value of energy-polling occurs on the coal pillars or on both sides of goaf. With the width of goaf, the maximum value of energy-polling increases in a parabola. (2) In the partial filling-partial caving multiple working faces coordinated mining based on the main key stratum, the stress distribution of the composite backfill in the filling working face is parabolic, and it is high on both sides and low in the middle. Moreover, in the composite backfill, the stress concentration degree of a outside coal pillar is greater than that of the inside coal pillar. (3)The control mechanism of partial filling-partial caving harmonious mining based on main key layer structure is the double-control cooperative deformation system, formed by the composite backfill and the main and sub-key layers structure. They jointly control the movement and energy accumulation of overlying strata by greatly reducing the effective space to transmit upward, and absorb the wave subsidence trend of the overburden until it develops into a single flat subsidence basin. (4) Considering the recovery rate, pillar rate, area filling rate, technical difficulty and subsidence coefficient etc., the partial filling-partial caving multiple working faces coordinated mining based on the main key stratum is the most cost-effective mining method to control surface subsidence. This paper takes a guiding role in controlling the regional strata movement and surface subsidence of deep mining with super-thick and weak cementation overburden.