This work proposes an expert management system of winding as linked with paper machine production planning and coordination. The integrated management system operates at three levels which receives the information of deckle buckets sent by paper machIne production planning. The main goal of deckle optimization at the highest level is to minimize the paper waste in arranging the reels in a bucket and provide the deckle information to a lower level. The winder optimization at the lower level receives the deckle information. The general goal of winding optimization is to maximize the roll quality and to provide the winding rate equal to the paper machine production. Corresponding to the generated optimum results, the winder optimization block generates the supervisory set point values such as: for web tension, and the target diameter of finished roll, to provide a high quality roll with the desired final diameter.
Read full abstract