Voltage deviations and power losses in the distribution network can be handled in various ways, such as adding diesel power plants and wind turbines. Adaut Village, Tanimbar Islands Regency, Maluku Province has installed a diesel power plant with a capacity of 1,200 kW, while the average hourly electricity load is 374.9 kW. Adaut Village has high wind potential that can be used for distributed generations namely wind turbine (WT). WT can be used to improve power quality in terms of power losses and voltage deviations. In adding WT, the capacity and location must be determined to get good power quality in terms of power loss and voltage deviation. The research applied an optimization technique for determining the capacity and location of WT using non-dominated sorting genetic algorithm II (NSGAII) with an objective function of power losses and voltage deviation. In addition, the economic aspects of the power plant were calculated using the levelized cost of energy (LCOE). The research used scenarios based on the number of WT installed. The best results were obtained in scenario IV or 4 WT with 1.38 kW on Bus 2, 422.43 kW on Bus 15, 834.33 kW on Bus 30, and 380.81 kW on Bus 31 which could reduce power losses by 80% with an LCOE value of Rp7,113.15/kWh. The addition of the WT could also increase the voltage profile to close to 1 pu, which means it can minimize the voltage deviation in the distribution network.
Read full abstract