The construction difficulty of the ultra-high fireproof sealing wall in the interior decoration project of Bengbu Sports Center is mainly that the height of the constructed fireproof sealing wall is 8.8 meters, with a local height of 14.3 meters. Its installation and overall adjustment are difficult. Fixed and load-bearing structures are also extremely important. In addition, the fire sealing wall not only needs to meet the requirements of fire sealing, but also needs to consider the sound absorption requirements of the competition venue outside the wall, and achieving its effect is also a challenge. This article introduces relevant construction control methods and the requirements and precautions for construction operations, ensuring the quality of construction of ultra-high fireproof sealing and soundproof walls.
Read full abstract