This document explains and demonstrates the problem that currently the installment of ceiling project’s bearing reaction is non-standard, combined with the example of the civil fitness center decoration project in Jinan which shows that all the ceilings should be installed with bearing reactions. This paper illustrate a construction program that by the use of L40 × 4 angle iron to enhance the bearing reactions based on the "GB50210-2001 code for construction quality acceptance of building decoration". Practice has proved that the stability and immobility of the ceiling’s bearing rations addition at the base of this program all meet the regulatory requirements. The program can be applied to all the ceiling projects that the bearing reactions are reburied when the boom is longer than 1.5m.