The development of offshore oil and gas fields require the placement of different equipment on the sea floor. This is done by deploying the equipment from vessels operating in dynamic positioning on the surface. The deployment operation has different phases, and in higher sea states, it may require wave-load synchronization, when the load is going through the splash zone, and heave compensation when the load is close to the sea floor. In this paper, we analyse the performance of a particular type of hardware operating in a heave compensation mode. We derive a comprehensive model, analyse limits of performance and evaluate a control strategy.