Abstract

The development of offshore oil and gas fields require the placement of different equipment on the sea floor. This is done by deploying the equipment from vessels operating in dynamic positioning on the surface. The deployment operation has different phases, and in higher sea states, it may require wave-load synchronization, when the load is going through the splash zone, and heave compensation when the load is close to the sea floor. In this paper, we analyse the performance of a particular type of hardware operating in a heave compensation mode. We derive a comprehensive model, analyse limits of performance and evaluate a control strategy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.